Shuikou Temple Bridge
Release Time:
Jun 29,2021
The main line of the S9 contract section (floating clear line) of the reconstruction project of Centian River Reservoir in Jianghua Yao Autonomous County adopts double-line and four-level roads criterion to construct. The designed speed is 20km / h, the width of roadbed is 6.5m, the road width is 6m, and using the C30 thickness of 22cm cement concrete pavement with the length of 3.222km. And this is the Shuikousi Bridge, the most important structure in the entire S9 highway project.
Centian River Reservoir Expansion &Road Reconstruction Project
http://old.ebnew.com/businessShow-v-id-535655521.html.
The website for the list of winning bidder:
http://old.ebnew.com/businessShow-v-id-535655521.html.
The main line of the S9 contract section (floating clear line) of the reconstruction project of Centian River Reservoir in Jianghua Yao Autonomous County adopts double-line and four-level roads criterion to construct. The designed speed is 20km / h, the width of roadbed is 6.5m, the road width is 6m, and using the C30 thickness of 22cm cement concrete pavement with the length of 3.222km. And this is the Shuikousi Bridge, the most important structure in the entire S9 highway project.
Keywords:
More information